Result: Development of Flash Flood Forecasting System for Small and Medium‐Sized Rivers.

Title:
Development of Flash Flood Forecasting System for Small and Medium‐Sized Rivers.
Source:
Journal of Flood Risk Management; Mar2025, Vol. 18 Issue 1, p1-15, 15p
Geographic Terms:
Database:
Complementary Index

Further Information

Owing to the increased frequency of short‐duration extreme rainfall events caused by climate change, peak flood flows are expected to increase substantially in small and medium‐sized rivers (SMRs) with a short time of concentration for a catchment (Tc). Accurate flood forecasts and corresponding evacuation are effective in reducing the number of casualties caused by flash floods in SMRs. Currently, flood forecasting using observed rainfall in SMRs has a short lead time, which often delays the issuance of evacuation orders by local governments. Moreover, the large number of SMRs necessitates a system that can be widely used by local governments for disaster response tasks, such as issuing evacuation orders. Therefore, we developed a system that can accurately predict when river water levels will reach the Flood Risk Level (FRL). This forecasting approach uses the rainfall–runoff–inundation (RRI) model and the H–Q equation. The parameters in the RRI model were optimized using the Shuffled Complex Evolution algorithm developed at the University of Arizona (SCE‐UA) to reduce the required time and effort. The system uses real‐time water level observation data to sequentially modify the basin state quantities in the RRI model using the particle filter method to improve the water level forecast accuracy. The system was implemented in 200 rivers in Japan with diverse rainfall and geological characteristics and was tested during the flood season. Accuracy verification was conducted when the forecasted water levels were operated within a range of ± 50 cm. The results showed that 75% of the flood events could be forecasted more than 2 h before reaching the FRLs. Furthermore, 89% of the flood events could be predicted with a lead time (LT; time that water levels reach the FRL—time of first forecast) of 2 h or more or a lead time equal to the Tc or more. These findings show that this system has the potential to enhance and strengthen flood warning and evacuation systems. [ABSTRACT FROM AUTHOR]

Copyright of Journal of Flood Risk Management is the property of Wiley-Blackwell and its content may not be copied or emailed to multiple sites without the copyright holder's express written permission. Additionally, content may not be used with any artificial intelligence tools or machine learning technologies. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract. (Copyright applies to all Abstracts.)