Result: Status report on the superconducting dipole magnet production for the LHC

Title:
Status report on the superconducting dipole magnet production for the LHC
Source:
The 2006 applied superconductivity conference, Seattle, WA, August 27-September 1, 2006. Part II of three partsIEEE transactions on applied superconductivity. 17(2):1097-1100
Publisher Information:
New York, NY: Institute of Electrical and Electronics Engineers, 2007.
Publication Year:
2007
Physical Description:
print, 9 ref 2
Original Material:
INIST-CNRS
Time:
2920
Document Type:
Conference Conference Paper
File Description:
text
Language:
English
Author Affiliations:
CERN, 1211 Geneva, Switzerland
ISSN:
1051-8223
Rights:
Copyright 2007 INIST-CNRS
CC BY 4.0
Sauf mention contraire ci-dessus, le contenu de cette notice bibliographique peut être utilisé dans le cadre d’une licence CC BY 4.0 Inist-CNRS / Unless otherwise stated above, the content of this bibliographic record may be used under a CC BY 4.0 licence by Inist-CNRS / A menos que se haya señalado antes, el contenido de este registro bibliográfico puede ser utilizado al amparo de una licencia CC BY 4.0 Inist-CNRS
Notes:
Electrical engineering. Electroenergetics

Electronics

Nuclear physics
Accession Number:
edscal.19016444
Database:
PASCAL Archive

Further Information

In August 2006, about 95% of the production of the 1232 LHC superconducting dipole cold masses, whose coils are wound with Cu/Nb-Ti cables, is completed. One of the 3 manufacturers, having produced one third of the required magnets, completed its production in the end of 2005. The acceptance of the magnets takes place after the 1.9 K performance tests and has been issued for more then 1000 magnets so far. More then half of the dipole magnets are already installed in the tunnel. The paper reviews the main features of the dipoles, the most important steps of the manufacturing and the most critical operations. The quality control and the critical non-conformities that have led, for instance, to a swift campaign of investigations and repairs of few subcomponents (diode assembly, cold bore tube to welding flare fillet weld) are discussed. The status of the production and the performance of the tested dipoles will be presented. Finally the expected schedule for the completion of the production will be shown.