Güner, E., Erol, S., & Tani, K. (1998). One machine scheduling to minimize the maximum earliness with minimum number of tardy jobs. International Journal of Production Economics, 55(2), 213-219. https://doi.org/10.1016/S0925-5273(98)00062-0
ISO-690 (author-date, English)GÜNER, Ertan, EROL, Serpil und TANI, Kazuo, 1998. One machine scheduling to minimize the maximum earliness with minimum number of tardy jobs. International Journal of Production Economics. 1 Januar 1998. Vol. 55, no. 2, p. 213-219. DOI 10.1016/S0925-5273(98)00062-0.
Modern Language Association 9th editionGüner, E., S. Erol, und K. Tani. „One Machine Scheduling to Minimize the Maximum Earliness With Minimum Number of Tardy Jobs“. International Journal of Production Economics, Bd. 55, Nr. 2, Januar 1998, S. 213-9, https://doi.org/10.1016/S0925-5273(98)00062-0.
Mohr Siebeck - Recht (Deutsch - Österreich)Güner, Ertan/Erol, Serpil/Tani, Kazuo: One machine scheduling to minimize the maximum earliness with minimum number of tardy jobs, International Journal of Production Economics 1998, 213-219.
Emerald - HarvardGüner, E., Erol, S. und Tani, K. (1998), „One machine scheduling to minimize the maximum earliness with minimum number of tardy jobs“, International Journal of Production Economics, Vol. 55 No. 2, S. 213-219.