Zhang, L., Zhang, Y., & Bai, Q. (2019). Two-stage medical supply chain scheduling with an assignable common due window and shelf life. Journal of Combinatorial Optimization, 37(1), 319-329. https://doi.org/10.1007/s10878-017-0228-8
ISO-690 (author-date, English)ZHANG, Long, ZHANG, Yuzhong and BAI, Qingguo, 2019. Two-stage medical supply chain scheduling with an assignable common due window and shelf life. Journal of Combinatorial Optimization. 1 January 2019. Vol. 37, no. 1, p. 319-329. DOI 10.1007/s10878-017-0228-8.
Modern Language Association 9th editionZhang, L., Y. Zhang, and Q. Bai. “Two-Stage Medical Supply Chain Scheduling With an Assignable Common Due Window and Shelf Life”. Journal of Combinatorial Optimization, vol. 37, no. 1, Jan. 2019, pp. 319-2, https://doi.org/10.1007/s10878-017-0228-8.
Mohr Siebeck - Recht (Deutsch - Österreich)Zhang, Long/Zhang, Yuzhong/Bai, Qingguo: Two-stage medical supply chain scheduling with an assignable common due window and shelf life, Journal of Combinatorial Optimization 2019, 319-329.
Emerald - HarvardZhang, L., Zhang, Y. and Bai, Q. (2019), “Two-stage medical supply chain scheduling with an assignable common due window and shelf life”, Journal of Combinatorial Optimization, Vol. 37 No. 1, pp. 319-329.