Bollineni, S. C. (2025). Hybrid Shuffled Shepherd-Hippopotamus optimization algorithm for repetitive activity scheduling in construction projects. Asian Journal of Civil Engineering: Building and Housing, 1-19. https://doi.org/10.1007/s42107-025-01538-x
ISO-690 (author-date, English)BOLLINENI, Sai Chand, 2025. Hybrid Shuffled Shepherd-Hippopotamus optimization algorithm for repetitive activity scheduling in construction projects. Asian Journal of Civil Engineering: Building and Housing. 8 Oktober 2025. P. 1-19. DOI 10.1007/s42107-025-01538-x.
Modern Language Association 9th editionBollineni, S. C. „Hybrid Shuffled Shepherd-Hippopotamus Optimization Algorithm for Repetitive Activity Scheduling in Construction Projects“. Asian Journal of Civil Engineering: Building and Housing, Oktober 2025, S. 1-19, https://doi.org/10.1007/s42107-025-01538-x.
Mohr Siebeck - Recht (Deutsch - Österreich)Bollineni, Sai Chand: Hybrid Shuffled Shepherd-Hippopotamus optimization algorithm for repetitive activity scheduling in construction projects, Asian Journal of Civil Engineering: Building and Housing 2025, 1-19.
Emerald - HarvardBollineni, S.C. (2025), „Hybrid Shuffled Shepherd-Hippopotamus optimization algorithm for repetitive activity scheduling in construction projects“, Asian Journal of Civil Engineering: Building and Housing, S. 1-19.