Arroyo, J. E. C., & de Souza Pereira, A. A. (2011). A GRASP heuristic for the multi-objective permutation flowshop scheduling problem. The International Journal of Advanced Manufacturing Technology, 55(5-8), 741-753. https://doi.org/10.1007/s00170-010-3100-x
ISO-690 (author-date, English)ARROYO, José Elias Claudio and DE SOUZA PEREIRA, Ana Amélia, 2011. A GRASP heuristic for the multi-objective permutation flowshop scheduling problem. The International Journal of Advanced Manufacturing Technology. 1 July 2011. Vol. 55, no. 5-8, p. 741-753. DOI 10.1007/s00170-010-3100-x.
Modern Language Association 9th editionArroyo, J. E. C., and A. A. de Souza Pereira. “A GRASP Heuristic for the Multi-Objective Permutation Flowshop Scheduling Problem”. The International Journal of Advanced Manufacturing Technology, vol. 55, no. 5-8, July 2011, pp. 741-53, https://doi.org/10.1007/s00170-010-3100-x.
Mohr Siebeck - Recht (Deutsch - Österreich)Arroyo, José Elias Claudio/de Souza Pereira, Ana Amélia: A GRASP heuristic for the multi-objective permutation flowshop scheduling problem, The International Journal of Advanced Manufacturing Technology 2011, 741-753.
Emerald - HarvardArroyo, J.E.C. and de Souza Pereira, A.A. (2011), “A GRASP heuristic for the multi-objective permutation flowshop scheduling problem”, The International Journal of Advanced Manufacturing Technology, Vol. 55 No. 5-8, pp. 741-753.