Qian, J., & Chang, G. (2022). A note on study on proportionate flowshop scheduling with due-date assignment and position-dependent weights. Optimization Letters, 16(9), 2645-2648. https://doi.org/10.1007/s11590-021-01843-9
ISO-690 (author-date, English)QIAN, Jin und CHANG, Guisong, 2022. A note on study on proportionate flowshop scheduling with due-date assignment and position-dependent weights. Optimization Letters. 1 Dezember 2022. Vol. 16, no. 9, p. 2645-2648. DOI 10.1007/s11590-021-01843-9.
Modern Language Association 9th editionQian, J., und G. Chang. „A Note on Study on Proportionate Flowshop Scheduling With Due-Date Assignment and Position-Dependent Weights“. Optimization Letters, Bd. 16, Nr. 9, Dezember 2022, S. 2645-8, https://doi.org/10.1007/s11590-021-01843-9.
Mohr Siebeck - Recht (Deutsch - Österreich)Qian, Jin/Chang, Guisong: A note on study on proportionate flowshop scheduling with due-date assignment and position-dependent weights, Optimization Letters 2022, 2645-2648.
Emerald - HarvardQian, J. und Chang, G. (2022), „A note on study on proportionate flowshop scheduling with due-date assignment and position-dependent weights“, Optimization Letters, Vol. 16 No. 9, S. 2645-2648.