Yi, J., Jia, S.- jin, & Du, B. (2021). Hybrid optimization for charge planning problem in twin strands continuous casting production. Journal of Iron and Steel Research International, 28(5), 520-529. https://doi.org/10.1007/s42243-021-00578-2
ISO-690 (author-date, English)YI, Jian, JIA, Shu-jin and DU, Bin, 2021. Hybrid optimization for charge planning problem in twin strands continuous casting production. Journal of Iron and Steel Research International. 1 May 2021. Vol. 28, no. 5, p. 520-529. DOI 10.1007/s42243-021-00578-2.
Modern Language Association 9th editionYi, J., S.- jin Jia, and B. Du. “Hybrid Optimization for Charge Planning Problem in Twin Strands Continuous Casting Production”. Journal of Iron and Steel Research International, vol. 28, no. 5, May 2021, pp. 520-9, https://doi.org/10.1007/s42243-021-00578-2.
Mohr Siebeck - Recht (Deutsch - Österreich)Yi, Jian/Jia, Shu-jin/Du, Bin: Hybrid optimization for charge planning problem in twin strands continuous casting production, Journal of Iron and Steel Research International 2021, 520-529.
Emerald - HarvardYi, J., Jia, S.- jin and Du, B. (2021), “Hybrid optimization for charge planning problem in twin strands continuous casting production”, Journal of Iron and Steel Research International, Vol. 28 No. 5, pp. 520-529.