American Psychological Association 6th edition

Shabtay, D., & Bensoussan, Y. (2012). Maximizing the weighted number of just-in-time jobs in several two-machine scheduling systems. Journal of Scheduling, 15(1), 39-47. https://doi.org/10.1007/s10951-010-0204-y

ISO-690 (author-date, English)

SHABTAY, Dvir and BENSOUSSAN, Yaron, 2012. Maximizing the weighted number of just-in-time jobs in several two-machine scheduling systems. Journal of Scheduling. 1 February 2012. Vol. 15, no. 1, p. 39-47. DOI 10.1007/s10951-010-0204-y.

Modern Language Association 9th edition

Shabtay, D., and Y. Bensoussan. “Maximizing the Weighted Number of Just-in-Time Jobs in several Two-Machine Scheduling Systems”. Journal of Scheduling, vol. 15, no. 1, Feb. 2012, pp. 39-47, https://doi.org/10.1007/s10951-010-0204-y.

Mohr Siebeck - Recht (Deutsch - Österreich)

Shabtay, Dvir/Bensoussan, Yaron: Maximizing the weighted number of just-in-time jobs in several two-machine scheduling systems, Journal of Scheduling 2012, 39-47.

Emerald - Harvard

Shabtay, D. and Bensoussan, Y. (2012), “Maximizing the weighted number of just-in-time jobs in several two-machine scheduling systems”, Journal of Scheduling, Vol. 15 No. 1, pp. 39-47.

Warning: These citations may not always be 100% accurate.